Past and Current Projects:
Relocation of Processing Unit & Installation of Mezzanine Floor
This unit was located centrally in the plant. We designed & engineered a new foundation in a new location and relocated it including a new mezzanine floor which was engineered, constructed and installed by us. The unit weighs 20,000 lbs and was moved utilizing Hillman rollers. All civil work including piles and caps, structure and anchoring was engineered and coordinated by Rossdale Machine including the subcontracting of all work.
This work was completed over a 3 week shutdown in which the entire plant layout was changed.
This unit was located centrally in the plant. We designed & engineered a new foundation in a new location and relocated it including a new mezzanine floor which was engineered, constructed and installed by us. The unit weighs 20,000 lbs and was moved utilizing Hillman rollers. All civil work including piles and caps, structure and anchoring was engineered and coordinated by Rossdale Machine including the subcontracting of all work.
This work was completed over a 3 week shutdown in which the entire plant layout was changed.
Tank Base Design Fabrication & Installation
Rossdale Machine provided a complete project solution for a 5000 gallon hot water storage tank. The tank was salvaged from another installation and transported to site. Our partner engineering firm, Bluecap Constructors, provided the design for the concrete foundation and steel base frame. Rossdale Machine fabricated, the base and installed it along with the tank and also the installation of 2 other poly storage tanks. The location was very challenging to work in as it was a drainage area. Due to the wet spring we had to use unconventional methods such as flotation tire equipment and matting to complete the installation.
Rossdale Machine provided a complete project solution for a 5000 gallon hot water storage tank. The tank was salvaged from another installation and transported to site. Our partner engineering firm, Bluecap Constructors, provided the design for the concrete foundation and steel base frame. Rossdale Machine fabricated, the base and installed it along with the tank and also the installation of 2 other poly storage tanks. The location was very challenging to work in as it was a drainage area. Due to the wet spring we had to use unconventional methods such as flotation tire equipment and matting to complete the installation.
Design & Installation of a Window Opening
Rossdale Machine was requested to provide engineering and installation for a new window opening in a concrete block wall for an art gallery renovation. We provided the engineering for the header and opening design and then performed the installation including concrete cutting, demolition, steel installation and grouting. This was done in a commercial business district where pedestrian safety and security were issues.
Rossdale Machine was requested to provide engineering and installation for a new window opening in a concrete block wall for an art gallery renovation. We provided the engineering for the header and opening design and then performed the installation including concrete cutting, demolition, steel installation and grouting. This was done in a commercial business district where pedestrian safety and security were issues.
Overhead Cardboard Conveyor
Rossdale Machine provided a complete conveyor system for a customer to carry cardboard waste to a compactor unit. This was a fast tracked project where the design, fabrication and installation were completed in 4 months. This unit is elevated 10 feet and is 100 feet long. The design was engineered by our partner engineering firm, constructed and installed by us. Rossdale Machine coordinated all civil work relating to this project including pile design and installation. The conveyor sections were salvaged from another installation and modified in our shop to provide a cost effective yet highly reliable unit.
Rossdale Machine provided a complete conveyor system for a customer to carry cardboard waste to a compactor unit. This was a fast tracked project where the design, fabrication and installation were completed in 4 months. This unit is elevated 10 feet and is 100 feet long. The design was engineered by our partner engineering firm, constructed and installed by us. Rossdale Machine coordinated all civil work relating to this project including pile design and installation. The conveyor sections were salvaged from another installation and modified in our shop to provide a cost effective yet highly reliable unit.
Industrial Oven
Rossdale Machine was retained to provide design, engineering, fabrication and installation of an industrial convection oven. The base unit for the oven was a 40 sea container. It was transported to our shop where we transformed it from an empty shell into a state of the art stainless steel lined processing unit. We provided engineering and design for all the process in conjunction with the owner. The interior is entirely stainless steel and completely seal welded to meet food grade service requirements. The unit was designed using plug style fans for ease of maintenance. We also designed and fabricated the burner chamber and hot air distribution system.
Rossdale Machine was retained to provide design, engineering, fabrication and installation of an industrial convection oven. The base unit for the oven was a 40 sea container. It was transported to our shop where we transformed it from an empty shell into a state of the art stainless steel lined processing unit. We provided engineering and design for all the process in conjunction with the owner. The interior is entirely stainless steel and completely seal welded to meet food grade service requirements. The unit was designed using plug style fans for ease of maintenance. We also designed and fabricated the burner chamber and hot air distribution system.
Car Shredder Installation
Rossdale Machine was sub contracted to provide installation assistance on a new car shredder installation for a local metal recycler. We provided manpower and expertise for heavy rigging, mechanical installation, structural installation & ducting assembly. We provided alignment and levelling services for the main shredder frames. As well we shop fabricated some of the walkway and stair assemblies. This was a 3 month project carried out in the winter under challenging conditions. It was completed with no safety issues.
Rossdale Machine was sub contracted to provide installation assistance on a new car shredder installation for a local metal recycler. We provided manpower and expertise for heavy rigging, mechanical installation, structural installation & ducting assembly. We provided alignment and levelling services for the main shredder frames. As well we shop fabricated some of the walkway and stair assemblies. This was a 3 month project carried out in the winter under challenging conditions. It was completed with no safety issues.
Underground Pipe and Fiberglass Tank Installation
Rossdale Machine was contracted to provide design, engineering, fabrication and installation for an underground drain system for a piece of process equipment. The water it was carrying was contaminated with biological matter and chemical residue. We provided all services to complete the project including the subcontracting of all concrete cutting and removal, pipe welding and installation, excavation and modification of the fiberglass tank by a specialized contractor.
Rossdale Machine was contracted to provide design, engineering, fabrication and installation for an underground drain system for a piece of process equipment. The water it was carrying was contaminated with biological matter and chemical residue. We provided all services to complete the project including the subcontracting of all concrete cutting and removal, pipe welding and installation, excavation and modification of the fiberglass tank by a specialized contractor.
Pallet Rack Installation
Rossdale Machine was requested to provide a solution for pallet cube storage. We designed, fabricated and installed the system utilizing some existing rack sections and fabricated the new stainless steel supports. The system was installed in the off hours so it did not hinder production in the facility. There was a requirement to place a piece of process equipment within the rack system so this was accommodated and worked into the design. All framing was either galvanized or stainless steel including all hardware.
Rossdale Machine was requested to provide a solution for pallet cube storage. We designed, fabricated and installed the system utilizing some existing rack sections and fabricated the new stainless steel supports. The system was installed in the off hours so it did not hinder production in the facility. There was a requirement to place a piece of process equipment within the rack system so this was accommodated and worked into the design. All framing was either galvanized or stainless steel including all hardware.